Document Type

Article

Publication Date

2015

Abstract

Contract damages aim to leave the injured party in as good a position as if the contract had been fulfilled. But discharged laborers often obtain a much better result due to the lack of a reduction for their excused work effort on breach. After first exposing the problematic ramifications of this unjustified deviation, this Article then provides two workable corrections.

Publication Title

George Mason Law Review

First Page

297

Volume

22

Included in

Law Commons

Share

COinS